Clearances - Trane Cold Generator CICD Series Installation, Operation And Maintenance Manual

Compact chiller 30 to 75 tons (60 hz), r-410a
Table of Contents

Advertisement

Clearances

Notes:
Clearance of 42 inch is required in front of chiller to
other electrically grounded parts.
Figure 8.
Clearance — CICD single chiller application (all condenser options)
CG-SVX044B-EN
Two units facing each other or other live parts require
a clearance of 48 inch.
36 inch clearance is recommended above the chiller.
See
Figure 9
and
Figure 10, p. 18
clearance requirements for array installations.
Dimensions and Weights
for recommended
17

Advertisement

Table of Contents
loading

Table of Contents