Download Print this page

Main Heat Exchanger - Ariston EGIS HE 24 Installation And Servicing Instructions

Condensing wall-hung gas boiler

Advertisement

8. maintenance guide

8.3.17 Main heat exchanger

Tools
Drain boiler (see 3.3)
Unscrew the screws of fl ue collector
1
Disconnect the condensate discharge pipe from the fl ue
collector
2
52
Remove the ignitor (Disconnect the electrical connectios)
TIME
25 min
3
Remove the fl ue collector
4
Unscrew the screws of the silencer
5

Advertisement

loading

This manual is also suitable for:

Egis he 30