4
SETTINGS AND THE PROCEDURE BEFORE
OPERATION
CHAPTER 4 SETTINGS AND THE PROCEDURE BEFORE
4.1
The Procedure Before Operation
This section describes the procedure before operation of the AJ65SBT2B-64AD.
Station number switch setting
(Set the station number of the AJ65SBT2B-
64AD.)
Module mounting
(Mount the AJ65SBT2B-64AD to the panel or
DIN rail.)
Wiring
(Connect CC-Link dedicated cables and
external devices to the AJ65SBT2B-64AD.
When connecting the module at the network
termination, turn on the L TER. switch or
connect a terminating resistor.)
Create programs.
Offset/gain setting
OPERATION
Start
Perform offset/gain
setting?
Yes
(Refer to Section 4.8.)
End
Figure 4.1 The procedure before operation
Refer to Section 4.3, Section 4.4.
...
Refer to Section 4.2, Section 4.5.
...
...
Refer to Section 4.6, Section 4.7.
Refer to CHAPTER 5.
...
No
Start data link.
4.1 The Procedure Before Operation
1
2
3
4
5
6
4
- 1