Download Print this page

American Standard SELECTRONIC 606B2 Series Installation Instructions Manual page 5

Concealed toilet flush valve 1.1. 1.28 & 1.6 gpf, exposed back spud/concealed back spud/top spud

Advertisement

INSTALL VACUUM BREAKER AND
4
FLUSH CONNECTIONS; Fig. 6
1. Place the SPUD FLANGE (1) over the spud on the Fixture. Fig. 6.
2. Place FRICTION WASHER (3) and SEAL WASHER (4) inside
SPUD COUPLING NUT (2) and thread onto Spud. Do not tighten
fully. Fig. 6.
3. Remove the ELBOW COUPLING NUTS (6, 6a) from the CHROME
ELBOW (5). Make sure you have a TAPERED RUBBER WASHER
(7), PLASTIC SUPPORT (8) and SQUARE SEAL WASHER (9).
Fig. 6a.
4. Install the SQUARE SEAL WASHER (9) onto the PLASTIC
SUPPORT (8) if not already installed. Insert the PLASTIC
SUPPORT (8) into the VERTICAL OUTLET PIPE (10). Slide the
ELBOW COUPLING NUT (6) onto the VERTICAL OUTLET PIPE
(10). Connect the ELBOW COUPLING NUT (6) to the CHROME
ELBOW (5) and tighten fully.
5. Insert the VERTICAL OUTLET PIPE (10) with assembled CHROME
ELBOW (5) into the SPUD COUPLING NUT (2) and push it down.
Do not tighten fully. Fig. 6a.
Note: Cutting the VERTICAL OUTLET PIPE (10) may be necessary
for the CHROME ELBOW (5) center line to line up with opening in
the wall.
6. Measure and cut the HORIZONTAL OUTLET PIPE (11) to length
required. Fig. 6b.
Important: Make sure that there is a minimum of 1-1/4" for
engagement with elbow when making your measurement.
7. Remove the ELBOW COUPLING NUT (14) from BRASS ELBOW
(12) and slide it onto the HORIZONTAL OUTLET PIPE (11). Install
the SQUARE SEAL WASHER (13) onto the PLASTIC SUPPORT
(15) if not already installed. Insert the PLASTIC SUPPORT (15) into
the HORIZONTAL OUTLET PIPE (11). Connect the ELBOW
COUPLING NUT (14) to the BRASS ELBOW (12) and tighten fully.
Fig. 6b.
8. From behind the wall, insert the assembled BRASS ELBOW and
HORIZONTAL OUTLET PIPE (12, 11) through the hole in the wall.
Install WALL ESCUTCHEON (16) onto the HORIZONTAL OUTLET
PIPE (11). Slide the ELBOW COUPLING NUT (6a) and TAPERED
RUBBER WASHER (7) onto the HORIZONTAL OUTLET PIPE (11).
Push the HORIZONTAL OUTLET PIPE (11) into the CHROME
ELBOW (5). Tighten ELBOW COUPLING NUT (6a) but not fully.
Fig. 6b.
9. For back spud installations: Follow steps #1 and #2 to install the
spud coupling kit. Push the HORIZONTAL OUTLET PIPE (11) into
the spud connection on the back of the fixture. Do not tighten fully.
If spud coupling kit is not required, install HORIZONTAL OUTLET
PIPE (11) into back spud on fixture and hand tighten. Fig. 6b.
10. All installations: If required, cut scored VACUUM BREAKER PIPE
(17), leave a minimum of 1-1/4" (32mm) of pipe to ensure
engagement with compression coupling. Assemble the ELBOW
COUPLING NUT (14a) and TAPERED RUBBER WASHER (19)
onto the VACUUM BREAKER PIPE (17). Install VACUUM
BREAKER PIPE (17) into BRASS ELBOW (12) and hand tighten
COUPLING NUT (14a). Fig. 6c.
Note: If cutting VACUUM BREAKER PIPE (17) to size, note that
Critical Line (C/L) on Vacuum Breaker must typically be 6"
(152mm) above fixture. Consult Code for details.
Fig. 6
2
3
1
Fig. 6a
6a
TAPERED SIDE
Fig. 6b
BACK SPUD
INSTALLATION
Fig. 6c
BACK SPUD
INSTALLATION
19
5
4
1-1/2" TOP SPUD
7
5
8
9
FLANGE END UP
6
10
2
TOP SPUD
15
INSTALLATION
13
12
FLANGE END
14
11
6a
11
TOP SPUD
INSTALLATION
17
TAPERED SIDE UP
14a
19
TAPERED
SIDE UP
12
M965640 Rev. 1.4 (11/17)
16
TAPERED
SIDE
7
5

Advertisement

loading