MAINTENANCE

INSTALL NEW BATTERY; Fig. 14
A
1. Remove the COVER PLATE (1). For removing front panel
instructions, see Step 10.
2. Remove old BATTERY (2) from BATTERY HOLDER (4).
Install the new BATTERY (3), making sure the shape
of the BATTERY (2) follows the shape of the BATTERY
HOLDER (4).
3. Install COVER PLATE (1).
B
ADJUST STOP VALVE; Fig. 15
IMPORTANT: To avoid overflowing, the STOP VALVE (2)
must never be opened to the point where the flow from
the valve exceeds the flow capacity of the fixture. Valve
is designed to provide stated flush volume with a 25
GPM flow rate.
1. After installation is complete, peel off the PROTECTIVE
FILM (1) from the sensor. Standing to one side, block
the sensor with your hand for 10 seconds. Remove your
hand and listen for audible "click" from within the valve.
2. Turn on STOP VALVE (2) 1/4 turn to 1/2 turn (CCW) and
test for leaks.
Note: Unit may flush for approximately 5 to 10 seconds
when water is first turned on. If flow persists, turn water
off and repeat step #1 above.
3. Actuate the FLUSH VALVE:
A) Cover sensor with hand for 10 seconds.
NOTE: Stand outside of sensor detection area.
B) Remove hand from detection area; unit will flush in
approximately 3 seconds.
4. Adjust STOP VALVE (2) after each flush until the stated
flush volume is achieved, no splashing occurs and the
fixture is properly cleansed.
Fig. 14
4
2
- P 2
C R
Fig. 15
1
10
3
INSTALL NEW
BATTERY
- P 2
C R
COUNTER-CLOCKWISE
OPENS STOP VALVE
CLOCKWISE CLOSES
STOP VALVE
M965640 Rev. 1.4 (11/17)