Clearances - Lopi Endeavor Owner's Manual

Hide thumbs Also See for Endeavor:
Table of Contents

Advertisement

Stove Installation

Clearances

The following clearances must be met.
Clearance Requirements:
A
Sidewall to stovetop
B
Back wall to stovetop
C
Corner wall to stovetop
D
Floor protection front
E
Floor protection side
F
Floor protection back
*Minimum total hearth depth
AUSTRALIAN FLUE KIT REQUIREMENTS:
The above clearances are in accordance to the following:
The heater is to be installed with a 150mm/6" Stainless Steel triple skin (default) flue kit (fitted with heat
shields see below) which conforms to the requirements of the joint AS/NZS 2918:2018 3.3.2 Standard,
Appendix, with respect to the rear wall, side wall, floor and ceiling surface temperatures, when tested in
the positions shown.
Heat Shield Options:
1. 200mm/8" Decorative Mesh, up into the drop box, with the 1
back.
2. 200mm/8" Solid painted casing.
© Travis Industries
(for qualified installers only)
With 8" solid painted
casing heat shield
500mm
225mm
150mm
350mm
108mm
163mm
1110mm
6/12/2019 - 1517
With 8" Decromesh
Casing heat shield
500mm
200mm
225mm
350mm
108mm
163mm
1110mm
length (900mm) to have a solid
st
9
Endeavor (AUST)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents