Further details regarding the individual steps
Yes
Automatic cali-
bration of the
combustion con-
trol unit
For further details regarding faults,
see page 71.
Checking the static and supply pressure
Danger
CO build-up as a result of an incorrect burner setup can have serious
health implications.
Carry out a CO test prior to and after work on gas equipment.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Thoroughly vent
the tank and gas supply lines after flushing.
Commissioning, inspection, maintenance
Fault Eb
No
(cont.)
Check the con-
necting cable and
the ionisation
electrode,
check the flue gas
system (flue gas
recirculation)
13