Terminal Guard - Baxi 35/80 IE Installation & Servicing Instructions Manual

Gas fired wall mounted system boiler
Table of Contents

Advertisement

Fig. 11
3. Locate the trim over the flue terminal and push it back to the wall to compress the seal
(Fig.
12).

7.11 Terminal Guard

(Fig.
13)
1. When codes of practice dictate the use of terminal guards, they can be obtained from most
Plumbers' and Builders' Merchants.
2. There must be a clearance of at least 50mm between any part of the terminal and the
guard.
3. When ordering a terminal guard, quote the appliance name and model number.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

60/100 ie

Table of Contents