PLATINUM
S eries
M eters
U ser's
G uide
2. Safety
C onsiderations
This
d evice
i s
m arked
w ith
t he
i nternational
c aution
s ymbol.
I t
i s
i mportant
t o
r ead
t his
m anual
b efore
installing
o r
c ommissioning
t his
d evice
a s
i t
c ontains
i mportant
i nformation
r elating
t o
S afety
a nd
E MC
(Electromagnetic
C ompatibility).
This
i nstrument
i s
a
p anel
m ount
d evice
p rotected
i n
a ccordance
w ith
2 014/35/EU,
e lectrical
s afety
requirements
f or
e lectrical
e quipment
f or
m easurement,
c ontrol,
a nd
l aboratory
u se.
I nstallation
o f
t his
instrument
s hould
b e
d one
b y
q ualified
p ersonnel.
In
o rder
t o
e nsure
s afe
o peration,
t he
f ollowing
i nstructions
m ust
b e
f ollowed
a nd
w arnings
observed:
This
i nstrument
h as
n o
p ower-‐on
s witch.
A n
e xternal
s witch
o r
c ircuit-‐breaker
m ust
b e
i ncluded
i n
t he
building
i nstallation
a s
a
d isconnecting
d evice.
I t
m ust
b e
m arked
t o
i ndicate
t his
f unction,
a nd
i t
m ust
be
i n
c lose
p roximity
t o
t he
e quipment
w ithin
e asy
r each
o f
t he
o perator.
T he
s witch
o r
c ircuit-‐breaker
must
c omply
w ith
t he
r elevant
r equirements
o f
I EC
9 47–1
a nd
I EC
9 47-‐3
( International
E lectro
t echnical
Commission).
T he
s witch
m ust
n ot
b e
i ncorporated
i n
t he
m ain
s upply
c ord.
Furthermore,
t o
p rovide
p rotection
a gainst
e xcessive
e nergy
b eing
d rawn
f rom
t he
m ain
s upply
i n
c ase
of
a
f ault
i n
t he
e quipment,
a n
o vercurrent
p rotection
d evice
m ust
b e
i nstalled.
Do
n ot
e xceed
t he
v oltage
r ating
o n
t he
l abel
l ocated
o n
t he
t op
o f
t he
i nstrument
h ousing.
•
Always
d isconnect
t he
p ower
b efore
c hanging
t he
s ignal
a nd
p ower
c onnections.
•
Do
n ot
u se
t his
i nstrument
o n
a
w ork
b ench
w ithout
i ts
c ase
f or
s afety
r easons.
•
Do
n ot
o perate
t his
i nstrument
i n
f lammable
o r
e xplosive
a tmospheres.
•
Do
n ot
e xpose
t his
i nstrument
t o
r ain
o r
m oisture.
•
Unit
m ounting
s hould
a llow
f or
a dequate
v entilation
t o
e nsure
t hat
t he
i nstrument
d oes
n ot
•
exceed
t he
o perating
t emperature
r ating.
Use
e lectrical
w ires
w ith
a dequate
s ize
t o
h andle
m echanical
s train
a nd
p ower
r equirements.
•
Install
t his
i nstrument
w ithout
e xposing
t he
b are
w ire
o utside
t he
c onnector
t o
m inimize
electrical
s hock
h azards.
EMC
C onsiderations
Whenever
E MC
i s
a n
i ssue,
a lways
u se
s hielded
c ables.
•
Never
r un
s ignal
a nd
p ower
w ires
i n
t he
s ame
c onduit.
•
Use
s ignal
w ire
c onnections
w ith
t wisted-‐pair
c ables.
•
Install
F errite
B eads
o n
s ignal
w ires
c lose
t o
t he
i nstrument
i f
E MC
p roblems
p ersist.
•
Failure
t o
f ollow
a ll
i nstructions
a nd
w arnings
i s
a t
y our
o wn
r isk
a nd
m ay
r esult
i n
p roperty
damage,
b odily
i njury
a nd/or
d eath.
O mega
E ngineering
i s
n ot
r esponsible
f or
a ny
d amages
o r
loss
a rising
o r
r esulting
f rom
a ny
f ailure
t o
f ollow
a ny
a nd
a ll
i nstructions
o r
o bserve
a ny
a nd
a ll
warnings.
Safety
C onsiderations
7