Final Steps; Check Faults; Final Steps On Web Server - Siemens OZW672 Series Commissioning Instructions

Web server v3.0 lpb and bsb plants
Hide thumbs Also See for OZW672 Series:
Table of Contents

Advertisement

Fault indication
Note
No fault
Fault
Final tasks
Note
38 / 102
Siemens
Building Technologies
2.9

Final steps

2.9.1

Check faults

The fault indicator displays the plant state.
No faults may be pending after commissioning. Additional information on faults
is available in Section 3.3.
The fault indicator remains green as long as no fault is pending.
The fault indicator changes to red for faults.
The most severe plant faults are displayed:
• Device name
• Fault text
2.9.2

Final steps on web server

The final function checks are conducted on the web server, the cover is mounted
and the LEDs checked.
On display and operating elements, see Section 1.2.
Procedure:
1.
Unplug USB cable.
2.
Switch off message suppression:
– Remove the cover
– Message suppression switch (8) must be on "Off"
3.
Mount terminal cover.
4.
Press Remote
– The web server sends a system report to the defined message receivers.
– Fault LED
(4) displays (flashing) error in establishing communications.
5.
On LED
must be green.
6.
Fault LED
must be dark.
Web server
Commissioning
(6) button for more than 6 seconds.
.
CE1C5712en
06.06.2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ozw672.01Ozw672.16Ozw672.04

Table of Contents