Assumption
The ET 200C distributed I/O station has been assigned a station number with
the ET 200 handheld (see Chapter 9). It is now time to start the station with
the programmer and COM ET 200 V4.x.
Procedure:
The ET 200C station is parameterized as follows:
Select Station
1. Connect your ET 200C module via an adapter cable and programmer
2. Open the "STARTUP/TEST" form of the COM ET 200 V.4x software
3. Enter the station number of the ET 200C station.
4. Confirm the entry with <F6> (ENTER).
Result
After the connection has been established, the station is assigned the con-
figuration data.
Rules
The station should now be coded with the current station number.
The station number can be changed using the ET 200 handheld.
Changing the
Note on changing the baud rate:
Baud Rate
Note
It is possible that the ET 200C station will not be admitted to the
SINEC L2-DP bus when an incorrect configuration is redefined and the baud
rate is changed at the same time.
6-4
connecting cable to the programmer (using interface module
CP5410-S5DOS/ST) (see Section 6.1).
package (press <F5> in the "FUNCTION SELECTION" form).
Result:
COM ET 200 V4.x now tries to establish a connection to the station.