Dhw Cylinder To Boiler Pipework - Wolf ComfortLine Series Installation And Maintenance Instructions Manual

Steel boilers up to 63 kw
Table of Contents

Advertisement

Install the pipework between the boiler and the
DHW cylinder in accordance with the
illustration below.
Note
The DHW cylinder loading
pump must supply from the
top to bottom.
Close any boiler flow and return connections
which are not required with caps and gaskets
supplied.
Elbows
Ferrule with
union nut
Cylinder loading pump
incl. gaskets
Gravity brake
DHW outlet
DHW circulation
Cold water inlet

DHW cylinder to boiler pipework

DHW cylinder to boiler pipework
Boiler flow 2x
Boiler return 2 x
Hoses with gaskets
Sensor well for DHW
cylinder sensor
2 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents