Wolf ComfortLine Series Installation And Maintenance Instructions Manual page 14

Steel boilers up to 63 kw
Table of Contents

Advertisement

Boiler assembly
Fit the boiler door
7
with the four M10x45 screws and
washers supplied.
Insert the door hinge pins into the door
bracket on the l.h. or r.h. side, subject to
door opening.
Hook the back wall casing
8
with tabs into the notches in the side
casing, and secure with the self-tapping
screws (4 no.) supplied.
Push the control unit housing
9
with locking tabs into the apertures in
the control unit bracket and pull forward
to its end stop. Secure the control unit
housing with the two self-tapping screws
supplied to the control unit at the l.h. and
r.h. rear, working from top to bottom.
Route the boiler sensor to the rear and
push into the sensor well in any
arrangement, then secure with the circlip.
1 4
M10x45 screws
Boiler door installation
Back wall notches
Self-tapping screws
Rear wall installation
Secure tightly
Control unit housing installation
Door
hinge pin
Locking tabs
Control unit bracket

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents