Wolf ComfortLine Series Installation And Maintenance Instructions Manual page 13

Steel boilers up to 63 kw
Table of Contents

Advertisement

5
Insert the side casing
into the boiler front pushing the spring
shackles
behind the boiler bracket
11
and fit the lower folded edge into both
notches (view X).
Locate the control unit bracket
6
centrally and push parallel forward,
until both recesses in the side casing
click into the control unit bracket tabs.
Secure the control unit bracket and side
casing with the self-tapping screws
supplied (6 no.).
Spring shackle
Side casing installation
Lower folded edge
of the side casing
Boiler notch
Side casing installation
Control unit bracket
Control unit bracket installation
Self-tapping screws
Side casing fixing screws
Boiler assembly
Bracket
View X
Hooks
Side casing
1 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents