Figure 4-2
Connecting to Power Supply
Note:
The figure is to illustrate the application and principle. The power plug you get from
the package and the socket in your situation will comply with the regulation in your
country, so they may differ from the figure above.
4.5
Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The PWR LED keeps on all the time.
■
The Link/Act LEDs and SYS LED will flash momentarily and the Link/Act LEDs will then
■
turn off.
The SYS LED will keep on for seconds and then flash, which represents a successful
■
initialization.
Load Balance Broadband Router
2
1
Connection
15