Initialization - TP-Link TL-R480T+ Installation Manual

Load balance broadband router
Hide thumbs Also See for TL-R480T+:
Table of Contents

Advertisement

Figure 4-2
Connecting to Power Supply
Note:
The figure is to illustrate the application and principle. The power plug you get from
the package and the socket in your situation will comply with the regulation in your
country, so they may differ from the figure above.
4.5

Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The PWR LED keeps on all the time.
The Link/Act LEDs and SYS LED will flash momentarily and the Link/Act LEDs will then
turn off.
The SYS LED will keep on for seconds and then flash, which represents a successful
initialization.
Load Balance Broadband Router
2
1
Connection
15

Advertisement

Table of Contents
loading

Table of Contents