Siemens SINAMICS G120 Compact Operating Instructions page 24

Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Commissioning
4.2 Commissioning with BOP-2 operator panel
9.
10.
11.
12.
13.
14.
15.
16.
17.
You have entered all of the data that is necessary for the basic commissioning of your
inverter.
24
Select the application:
OP LOOP Recommended setting for standard applications.
CL LOOP
HVY LOAD Recommended setting for applications with a high break
Select the default setting for the interfaces of the inverter that is suita-
ble for your application. The available default settings can be found in
the operating instructions, see: Manuals for your inverter (Page 31).
Minimum and maximum motor speed
Motor ramp-up time
Motor ramp-down time
Ramp-down time for the OFF3 command
Motor data identification
Select the method which the inverter uses to measure the data of the
connected motor:
OFF
ST RT OP Recommended setting: Measure the motor data at stand-
STILL OP
Complete the basic commissioning:
17.1. Switch over the display using an arrow key: nO → YES
17.2. Press the OK key.
Recommended setting for applications with short ramp-
up and ramp-down times. This setting is not suitable for
hoisting gear and cranes/lifting gear.
loose torque.
Motor data is not measured.
still and with the motor rotating.
Measure the motor data at standstill.
Select this setting if the motor cannot rotate freely – for
example, if the traversing range is mechanically limited.
Compact Operating Instructions, 04/2015, A5E35792002B AA
CU240B-2 and CU240E-2 Control Units

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240b-2Cu240e-2

Table of Contents