Monitor and control equipment
To create a group override CCN time schedule
When a group of controllers is assigned a matching Override Group number, an override from a single
controller in the group can cause all of the controllers in the Override group to be to overridden. The override
duration is set in i-Vu CCN Pro, even though i-Vu CCN Pro supports push-button override.
In order for a controller to initiate a remote override request:
•
Set the actual duration of the override in i-Vu CCN Pro.
•
Do not set the controller's local override hours to 0.
•
The controller's setting must be greater-than or equal-to the i-Vu CCN Pro override duration.
NOTES
•
It is recommended that the local override value at the controller be set to its maximum possible setting.
•
Equipment activation, when using PBOR's, is normally instantaneous, but varying delays are possible.
•
Do not press the button a second time, as this could cause the override to be cancelled.
In order to have a specific controller initiate a group override, the override duration in its local database must
not be zero.
On the navigation tree, select the equipment or area that you want to schedule for a group override.
1
Click the Schedules page, then CCN tab.
2
Enter the number of minutes in Override Time.
3
NOTE The override setting in the controller must not be set to 0.
Assign a number to Override group.
4
To apply a schedule to single equipment or to all equipment in an area
Schedules in i-Vu CCN Pro are typically based on zone occupancy.
On the navigation tree, select the equipment you want to schedule.
1
NOTE To schedule all equipment in a specified area, select the area you want.
Click the Schedules page > Configure tab.
2
Click Add.
3
Select a Priority. (Normal is low priority; Holiday is medium; Override is high.)
4
Select a Type. See table below.
5
Type a schedule name in the Description field.
6
Enter desired values in the fields below Description.
7
Change the default time segment (shown as a colored bar) for the schedule by doing one of the
8
following:
Click the segment, then type Start and End times in the fields above the segment.
○
Click and drag either end of the segment or the entire segment.
○
Optional: Click Show Advanced below the schedule bar to add one or more separate segments to the
schedule.
48