Working With Universal And Comfort Controllers (Ccn); Create Custom Equipment Files For Uc/Cc's That Link Only To Cnn Points - Carrier i-Vu CCN Pro 4.2 Installation Manual

Table of Contents

Advertisement

Operating i-Vu CCN Pro
Right-click the device or devices (CTRL-click) in the System Setup table
1
Choose Download from drop down menu.
2

Working with Universal and Comfort Controllers (CCN)

Universal Controllers (UC) and Comfort Controllers (CC) that are scanned into the system in System Setup will
be assigned a generic equipment and view file, which have setpoint control, but no additional pre-mapped
I/O. In order to have additional I/O points available for graphic display, you must use ApplicationBuilder to
create the custom equipment files to support your application. These files will map the CCN variables to i-Vu
BACnet points.
In ApplicationBuilder, you can create CCN Values Only, Read Integration, or Link Integration custom
equipments for UC/CC that are tailored for your specific application.
ApplicationBuilder can also create some stand-alone applications for Consumable Reports for:
Energy Meters
Non-linear flow meters
Energy (BTU) consumption
Equipment Runtime
These options can also be added to CCN Values Only and Link Integration custom equipments and only
require mapping of the points to be monitored.
Once the equipment files and the view file are uploaded to i-Vu CCN Pro (page 22), these points can be
assigned to custom graphic elements, which are created in ViewBuilder.
Because CC's will likely control multiple pieces of HVAC equipment, expansion controllers associated with
CC's must be added to i-Vu CCN Pro from System Setup. This allows separate setpoint and schedule control
of these multiple physical equipments from a single CC. These expansion controllers support the additional
equipment and view files required for these "separate" systems.

Create custom equipment files for UC/CC's that link only to CNN points

ApplicationBuilder creates an equipment file for the UC/CC, which maps the I/O points that are required for
one or more applications. Once these files are created, these linked I/O points can then be associated with
ViewBuilder graphics.
NOTE To have a Prime Variable, (a temperature that is displayed in a color oval when the CC or UC is shown
in a site or area equipment list), the Schedule and Setpoint option must be selected when creating the
equipment file.
Start ApplicationBuilder. (Windows Start > All Programs > iVu Tools 4.2)
1
Click Create Equipment.
2
Select equipment type: Custom Equipment > CCN Values Only.
3
Click Next.
4
Type a name for the custom equipment (i.e., Hot Water system) next to Equipment Name.
5
Enable English or Metric units.
6
Select options from the drop down menus.
7
18
i-Vu CCN Pro 4.2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents