Download Print this page

Application Information - Goodman CH SERIES Installation Instructions Manual

Horizontal two-way coil

Advertisement

INSTALLATION AND OPERATING INSTRUCTIONS FOR
IMPORTANT
"The United States Environmental Protection Agency (EPA) has issued various regulations regarding the
introduction and disposal of refrigerants in this unit. Failure to follow these regulations may harm the environment
and can lead to the imposition of substantial
must perform the installation and service of this product. Should you have any questions, please contact the
local office of the EPA."
This product is designed and manufactured to permit installation in accordance with national codes. It is the
installers responsibility to install this unit in accordance with national codes and / or prevailing local codes and
regulations.
RIGHT APPLICATION
1. Coil must be installed upstream (discharge side) of the furnace. This is a bi-directional coil and can be installed in
either direction. Determine the coil direction by the side that allows the best access.
2. If the furnace and coil are not similar in depth and width, a field-supplied transition can be used to center the furnace and
coil openings. An attachement bracket (Z-bracket) has been included to attach the coil to a narrower Goodman or
Amana furnace when the furnace is one size smaller than the coil (i.e. coil height = 17.5-inches and furnace width = 14-
inches) (See figure 3).
3. To reverse from right to left application, relocate the front rail to the back, and the back rail to the front. Then attach
flanges to the dicharge side of the unit.
FIGURE 2:
(Horizontal right application)
BACK RAIL
IO-237C
HORIZONTAL TWO-WAY COILS (CH SERIES)
fines. These regulations may vary by jurisdiction. A certified technician

APPLICATION INFORMATION

(Front View for right & left hand application)
ATTACHING THE DUCT FLANGE
Made in the USA by:
Goodman Manufacturing Company, L.P.
2550 North Loop West, Suite 400, Houston, TX 77092
www.goodmanmfg.com or amana-hac.com
2004-2006 Goodman Manufacturing Company, L.P.
©
FIGURE 1:
FRONT RAIL
LEFT APPLICATION
LOOSEN FASTENER AND
PULL FLANGE FORWARD
AND RETIGHTEN
SHIPPING BRACKET
TO BE REMOVED PRIOR
TO INSTALLATION
DUCT FLANGE
06/06

Advertisement

loading

This manual is also suitable for:

Chpf4860