Internal Connections; Power Cord - Follett Horizon Elite series Installation Instructions Manual

Table of Contents

Advertisement

Connect louvered docking assembly to ice
machine.
• Plug must be accessible after final installation.
• H_E1410A/W 230/50/1 requires a 20A circuit (4.00 mm
Air-cooled ice machines – follow steps 7.1 through 7.5.
7.1
Ice transport tube
• Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3

Power cord

• Remove twist tie
• Carefully pass cord thru opening and plug
into wall outlet
• For H_E units, install a suitable plug
14
CAUTION
2
wire)
self-contained

Internal connections

7.2
Potable water and drain lines
• Insert potable water line into valve
7.4
Power cord
• Position plate into opening and secure
with supplied screw
HARMONY • TOP-MOUNT
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents