Maintenance - TAGSON PS-2/ES English Manual

Automated pack & tag machine with indes fastening system
Table of Contents

Advertisement

1. STARTING TO OPERATE THE MACHINE
→ Load staples.
→ Press the switch for ejector rod
staples properly.
→ Position the product between the module assembly needles.
→ Adjust the height of the card holder
→ Make sure the area is clear of everything but the product intended for fastening.
→ Press finger switches using both hands
→ While holding the switches, the module will go down to its final position and eject the
staples.
→ Release the switches
automatically load the next fastener for use.
→ Remove the product from the working area.
→ Make sure not to operate the actuation switch again until the machine has completely
reloaded. Premature actuation may cause the machine to jam.
CAUTION: Make sure needles do not touch the product. This might cause needle break
and product damage.
2. ADJUSTING TIMING OF EJECTOR ROD: CYCLE B
With the ejector rod screw
turning the screw, you set the timing of the ejector rod.
NOTE: The optimal setting of cycle B is when the ejector rod launches the fastener while the
module remains at its lowest position for 0.5 sec.

Maintenance

This chapter explains the routine maintenance of the Tagson Pack & Tag machine and its spare
parts replacement. After finishing, always clear the machine with the air blow gun
the needle plate
.
WARNING! Prior to any maintenance, replacement or repair, air supply must be switched off.
Compressed air is required to operate the machine, and air supply should be free of moisture or
other contaminants. Supply must be capable of sustaining line pressure of maximum 80 psi/5,5
bar for table mount units such as Tagson portable Pack & Tag machine.
For maintenance of spare parts replacement, please see the original safety and manual instruction
book IndES Avery Dennison fastening system.
14
a few times to make sure the module ejects the
and laser marker
by lifting the module to its upper position. The machine will
you can adjust the timing of the ejector rod (cycle B). By gently
.
and hold the switches in place.
, especially on

Advertisement

Table of Contents
loading

Table of Contents