Installation; Unpacking Procedures; Transportation Procedures - Mitsubishi CR751-D Instruction Manual

Hide thumbs Also See for CR751-D:
Table of Contents

Advertisement

2.2 Installation

2.2.1 Unpacking procedures

The controller is shipped from the factory packaged in cardboard.

2.2.2 Transportation procedures

The following shows how to transport the controller.
Mass:
Approx. 16kg
Fig. 2-1 : Transporting the controller
1) Slightly tilt the controller and put your hands underneath. Providing steady support with both hands, lift it up
and transport.
Be careful not to trap fingers when transporting the controller.
CR750 controller
CR751 controller
Mass:
Approx. 12kg
2Unpacking to installation
Installation 2-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr750-d

Table of Contents