Setting The Operation Schedule; Schedule Setting Flowchart; Set Schedules Screens - Mitsubishi Electric AT-50B Instruction Book

Air-conditioner control system, advanced touch controller
Hide thumbs Also See for AT-50B:
Table of Contents

Advertisement

Usage - Main Menu Settings
Operation Setting (cont'd)
Main Menu > Operation Setting > Time and Schedule > Set Schedules

Setting the operation schedule

B
Use to assign an operation pattern for each day of the week to be
Weekly
executed every week.
Use to assign unique operation patterns for specific dates (up to seven
One day
days in advance, including the current date).
[Note] If a specific pattern is assigned to multiple groups or days and the configuration of the pattern is changed, the
change will be reflected on all the groups and days.
Use a different pattern number to save a given configuration of events if you do not want the changes to be
reflected on the groups and days to which the pattern is assigned.

Schedule setting flowchart

Step 1
Select the Weekly or One day tab.
Weekly
Step 2
Validity period.
Step 3
Select a group.
Step 4
Select days or dates.
Step 5
Assign a pattern to the selected
days or dates.
Step 6
Configure the pattern.
30
Types of schedules

Set Schedules screens

One day
Group-and-day/date-selection screen
Pattern-selection screen
Edit-Pattern screen
Number of operation patterns
Maximum 12 patterns
Maximum 5 patterns
Seasonal settings screen

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents