Cleveland Steamcraft II Service Manual page 24

Table of Contents

Advertisement

Reconnect red and grey probe wires to the proper terminals with their lockwashers and nuts. Re-
energize the main fused power connection.
STEAMER TESTING
Test the steamer for proper operation. Push the power switch to the "ON" position. The red light will illuminate
when the steamer is on. Turn the steam control knob to number "10". Leave the cooking compartment door open.
Steam should begin to appear inside the cooking compartment after approximately 5 minutes . Inspect plumbing for
leaks.
If the steamer is operational, push the power switch to the "OFF" position, then turn the steam control knob to zero.
Finally, reinstall the outer sheeting, securing it with the six screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cet5

Table of Contents