Furuno CH-37 Installation Manual page 14

Color sector scanning sonar
Hide thumbs Also See for CH-37:
Table of Contents

Advertisement

1. MOUNTING
6. Set the grease cotton to the main body flange and tighten the grease cotton re-
tainer temporarily.
7. Temporarily fasten the fastening band onto the main shaft at the location shown
below.
Figure 1-9 Fastening the fastening band on the main shaft
8. Inscribe bow mark at the top of the main shaft. Pass pipe clamp through the main
shaft and install washer, gasket and cable gland.
Figure 1-10 Passing pipe clamp, gasket, flat washer and cable gland on main shaft
1-6
Wind grease cotton onto
main shaft and cut it as
shown below.
Flat washer
Figure 1-8 Installing grease cotton on the main shaft
Lt: Tank length
70
Tighten cable gland for gap
of approx. 3 mm.
Space joint of grease cotton
120° apart and push them into
body flange.
Lt - 430 mm
Fastening band
Pipe clamp
Hold here with
pipe wrench
3
Inscribe bow mark,
referring to the bow mark
on the soundome.
Gasket
Cable gland
Flat washer
Pipe cap
For 2.2/3.8 m shaft

Advertisement

Table of Contents
loading

Table of Contents