SECTION 7: PRE-OPERATION

7.1 Overview

The Rotofilter must be checked after installation to
verify that all elements are ready for operation, and
to prevent damage to the unit or other equipment.
Some components may need to be adjusted due to
shifting during the shipping or installation process.
The electrical components must be checked for
proper operation and the Rotofilter will need to run
for a 24-hour period to allow for final calibration.
Follow all sections sequentially.

7.2 Checking Fasteners

Check the fasteners that secure the screen
clamps and the support wheels. These fasteners
can loosen during the shipping and installation
processes.
7.2.1 Tools
SAE open-end wrench set
SAE hex key wrench set
Torque wrench
Figure 14. Adjusting the screen clamp fasteners
1: Open-end Wrench
2: Hex Key Wrench
3: Gasket
PR Aqua Rotofilter
Drum Filter Installation and Operation Manual
1. Turn off power to the Rotofilter.
2. Lock out the control panel.
3. Remove the Rotofilter lid.
4. Adjust the screen clamps until the gasket (the
material underneath the clamp) is compressed by
approximately 3.2 millimeters (0.125 inches).
5. Check that all filter screens are installed
and undamaged. If screens are damaged,
see Section 11.1.
6. Tighten support wheel bolts with a torque
wrench.
Figure 15. Support wheel bolts
(wheel assembly appearance may vary)
1: Support Wheel Bolts