TRANSPORT

The UPS is fixed on transport socket suitable for forklift, which include a special layer of Ethafoam
to protect the equipment against the transport shock.
Normally the UPS is packaged with carton box.
On request the equipment can be packaged in wooden case.
Move the UPS in its original package to the final destination room.
Do not stack other package on top: they could damage the upper side of the cabinet.
NOTE !
When moving the UPS, pay attention to:
Forklift
Crane
Fig. 3.1-1 LP 33 lifting
WARNING !
When loading / downloading and when
moving the UPS, it is forbidden:
When loading / downloading and when
moving the UPS, pay attention to:
OPM_LPS_3UI_10K_20K_0US_V010.doc
3

INSTALLATION

Forklift
The UPS may be lifted with a forklift in
upright position from right and left side.
Take note of the center of gravity marked on
the package.
NOTE !
Check for sufficient floor and elevator
loading capacity.
Transport UPS only in upright position.
Do not stack other package on top of
the UPS.
Crane
If the UPS has to be lifted by crane, use
suitable carrying belts taking note of the
center of gravity marked on the package.
11/38
SENSITIVE
SENSITIVE
FRAGILE
TO DAMPNESS
TO HEAT
Installation Guide LP 33 / 10 - 20 kVA
g
SENSITIVE
TO FROST

Advertisement

Table of Contents
loading

Table of Contents