Additional Static Resistance Imperial; Additional Static Resistance Metric - York ZF180 Installation Manual

Zf series
Hide thumbs Also See for ZF180:
Table of Contents

Advertisement

5168276-XIM-B-0216
Supply Air Drive Adjustment
The RPM of the supply air blower will depend on the required
CFM, the unit accessories or options and the static resistances
of both the supply and the return air duct systems. With this
information, the RPM for the supply air blower and the motor
pulley adjustment (turns open) can be determined from the
Blower Performance Data Tables.
Belt drive blower systems MUST be adjusted to the
specific static and CFM requirements for the application.
The belt drive blowers are NOT set at the factory for any
specific static or CFM. Adjustments of the blower speed
and belt tension are REQUIRED. Tighten blower pulley
and motor sheave set screws after these adjustments.
Re-checking set screws after 10-12 hours run time is
recommended.
Table 23: Additional Static Resistance Imperial
Size
Model
CFM
(Tons)
4500
180
ZF
6000
(15)
7500
6000
7500
240
ZF
9000
(20)
10500
12000
1. Add these values to the available static resistance in the respective Blower Performance Tables.
2. Deduct these values from the available external static pressure shown in the respective Blower Performance Tables.
3. The pressure drop through the economizer is greater for 100% outdoor air than for 100% return air. If the resistance of the
return air duct is less than 0.25 IWG, the unit will deliver less CFM during full economizer operation.
Table 24: Additional Static Resistance Metric
Size
3
Model
M
(Tons)
2.12
180
ZF
2.83
(15)
3.54
2.83
3.54
240
ZF
4.25
(20)
4.96
5.66
1. Add these values to the available static resistance in the respective Blower Performance Tables.
2. Deduct these values from the available external static pressure shown in the respective Blower Performance Tables.
3. The pressure drop through the economizer is greater for 100% outdoor air than for 100% return air. If the resistance of the
return air duct is less than 62 Pa , the unit will deliver less M
36
1
Cooling Only
0.10
0.10
0.10
0.10
0.10
0.15
0.15
0.20
1
/S
Cooling Only
25
25
25
25
25
37
37
50
Note the following:
1.
The supply air CFM must be within the limitations shown in
the Blower Performance Tables 18 and 19.
2.
Pulleys can be adjusted in half turn increments.
3.
The tension on the belt should be adjusted as shown in the
Bet Adjustment, Figure 20.
4.
Tighten blower pulley and motor sheave set screws after
any adjustments. Re-check set screws after 10-12 hours
run time recommended.
2 3
Economizer
18
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.10
0.15
0.20
0.20
0.30
2
3
Economizer
,
18
25
25
25
25
25
25
25
25
25
25
37
25
37
50
50
74
3
S during full economizer operation.
2
Electric Heat kW
36
54
0.10
0.20
0.20
0.20
0.30
0.40
0.30
0.40
0.60
0.10
0.20
0.20
0.20
0.30
0.40
0.30
0.40
0.60
0.40
0.60
0.80
0.50
0.70
0.90
Electric Heat kW2
36
54
25
50
50
75
100
74
99
150
25
50
50
74
100
74
99
150
99
150
199
124
174
224
Johnson Controls Unitary Products
72
72
50
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zf240

Table of Contents