General Installation Information cont.
Contaminated Water
In applications where the water quality cannot be held to
prescribed limits, the use of a secondary or intermediate
heat exchanger is recommended to separate the unit from
the contaminated water. The table below outlines the
water quality guidelines for unit heat exchangers. If these
conditions are exceeded, a secondary heat exchanger is
required. Failure to supply a secondary heat exchanger
where needed will result in a warranty exclusion for primary
heat exchanger corrosion or failure.
Low Water Coil Limit
Set the freeze sensing switch SW2-1 on the Aurora Base
Control (ABC) printed circuit board for applications using
a closed loop antifreeze solution to "LOOP" (15°F). On
applications using an open loop/ground water system (or
closed loop no antifreeze), set this dip switch to "WELL"
(30°F), the factory default setting. (Refer to the DIP Switch
Settings table in the Aurora Control section.)
Material
pH
Acidity/Alkalinity
Scaling
Magnesium Carbonate
Hydrogen Sulfide
Carbon Dioxide
Corrosion
Ammonia Chloride
Ammonia Nitrate
Ammonia Hydroxide
Ammonia Sulfate
Total Dissolved Solids (TDS)
Iron, FE
Bacterial Iron Potential
Iron Fouling
(Biological Growth)
Suspended Solids
Erosion
Threshold Velocity
NOTES: Grains = ppm divided by 17
mg/L is equivalent to ppm
Calcium and
less than 350 ppm
Less than 0.5 ppm (rotten egg
smell appears at 0.5 ppm)
Sulfates
Less than 125 ppm
Chlorine
Less than 0.5 ppm
Chlorides
Less than 20 ppm
Less than 50 ppm
Ammonia
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 1000 ppm
LSI Index
2
+ (Ferrous)
Less than 1 ppm, above this
Iron Oxide
level deposition will occur
Less than 10 ppm and filtered
for max. of 600 micron size
(Fresh Water)

Condensate Drain

To facilitate complete condensate removal, the outdoor
package unit should be mounted level or slightly pitched
towards drain. A PVC tube and coupler are provided with
the unit. The coupler and tube need to be field installed to
the drain pan using PVC primer and glue. An external trap
is required (see figure 3) otherwise condensate will not
drain during unit operation. If a vent is necessary, an open
stand pipe may be applied to a tee in the field installed
condensate piping. The vent must be installed on the outlet
side of the condensate trap as shown in figure 3 or proper
drainage will not occur. Mastic tape is provided to seal
around the condensate opening.
Note: Do not operate the heat pump without a trap.
Figure 3: Condensate Drain Connection
Copper
7 - 9
(Total Hardness)
Less than 2 ppm
+0.5 to -0.5
< 0.2 ppm
Less than 1 ppm, above this
level deposition will occur
Less than 10 ppm and filtered
for max. of 600 micron size
< 6 ft/sec
8
3/4 in. PVC tube stub
PVC coupling
1.5 in.
1.5 in.
90/10 Cupronickel
7 - 9
(Total Hardness)
less than 350 ppm
10 - 50 ppm
Less than 125 ppm
Less than 0.5 ppm
Less than 125 ppm
10 - 50 ppm
Less than 2 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
1000 - 1500 ppm
+0.5 to -0.5
< 0.2 ppm
Less than 1 ppm, above this
level deposition will occur
Less than 10 ppm and filtered
for max. of 600 micron size
< 6 ft/sec
Vent (if needed)
PVC tube stub
1/8 in. per foot
316 Stainless Steel
7 - 9
(Total Hardness)
less than 350 ppm
Less than 1 ppm
Less than 200 ppm
Less than 0.5 ppm
Less than 300 ppm
10 - 50 ppm
Less than 20 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
Less than 0.5 ppm
1000 - 1500 ppm
+0.5 to -0.5
< 0.2 ppm
< 6 ft/sec
2/22/12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yap038Yap049Yap072Yap064

Table of Contents