Cisco MDS 9148T Hardware Installation Manual page 37

32-gbps 48-port fibre channel switch
Hide thumbs Also See for MDS 9148T:
Table of Contents

Advertisement

Installing the Cisco MDS 9148T Switch
Figure 11: Installing Rack-Mount Brackets on the Front Side of the Chassis
Step 2
If you are installing the chassis into an ungrounded rack, you must attach a customer-supplied grounding wire to the
chassis, as explained in
skip this step.
Step 3
Install the switch onto the 2-post rack:
1. Holding the switch with both hands, position the back of the switch between the two posts of the rack. Then gently
move the switch until the rack-mount brackets come in contact with two rack posts.
2. Holding the chassis level, insert three screws (12-24 or 10-32, depending on the rack type) into each of the two
rack-mount brackets (using a total of six screws) and into the cage nuts or threaded holes in the rack or cabinet posts.
Grounding the
Switch. However, if you are installing the chassis into a grounded rack, you can
Cisco MDS 9148T 32-Gbps 48-Port Fibre Channel Switch Hardware Installation Guide
Installing the Switch into a 2-Post Rack
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents