Step 4
Position the pole clamp bracket on the pole as needed before tightening the metal bands.
Note
Tighten the metal bands using the banding strap tool (BAND IT) (Cisco AIR-BAND-INST-TL=),
Step 5
following the operating instructions in the box with the tool. Ensure the metal bands are as tight as
possible.
Step 6
Place the mounting bracket onto the pole clamp bracket support bolt (see
Step 7
For vertical poles, position the mounting bracket as shown in
poles, rotate the mounting bracket 90
Step 8
Install four M8 x16 bolts (with flat and lock washers) into the bolt holes.
Figure 2-13
1
Pole clamp bracket assembly
2
Access point support bolt
(M8 flange nut not shown)
Step 9
Hand-tighten the bolts and the nut (do not overtighten).
Step 10
Adjust the top edge of the mounting bracket until it is horizontal and tighten the bolts and the flange nut
(see
Figure
Note
OL-12632-03
When the metal bands are tightened to the full tension, the pole clamp bracket cannot be adjusted
unless the metal bands are cut or disassembled.
Screw Hole Locations on the Mounting Bracket and Pole Clamp Bracket Assembly
2-13) to 13 to 15 ft lbs (17.6 to 20.3 Nm).
The mounting bracket can be adjusted up to 45
poles.
Cisco Aironet 1520 Series Outdoor Mesh Access Point Hardware Installation Guide
Figure
o
from the position shown in
3
Bolt holes
4
Mounting bracket
o
to compensate for tilted horizontal streetlight
Mounting the Access Point
Figure
2-13).
2-13. For horizontal streetlight
Figure
2-13.
2-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aironet lap1524

Table of Contents