Maintenance; Scheduled Maintenance - BKI DNF Installation And Operation Manual

Bakers pride oven co. doughnut fryer installation & operation manual
Table of Contents

Advertisement

Doughnut Fryer
Failure to comply with the maintenance below could result in a serious accident.
Your fryer will need periodic maintenance and servicing. We strongly suggest
that you use only a service company that is authorized by BKI to do this work.
The DNF appliance is not intended to be cleaned with a water jet.

Scheduled Maintenance

Use the following table to help manage scheduled maintenance activities.
FREQUENCY
PERFORMED BY
Daily
User
User
Weekly
User
Every 6 Months
Authorized BKI
service agent

Maintenance

PART
Filter Pad
Replace filter pad. Refer to the
procedure in this manual.
Filter system
Filter the shortening using the
procedure in this manual.
Fryer Vat
Perform the boil-out procedure in this
manual.
Connections,
Check for leakage while oil is
Fittings
pumping.
16
Maintenance
ACTIVITY

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dnf-f

Table of Contents