LG ARUM072BTE5 Installation Manual page 39

Multi v 5 series
Hide thumbs Also See for ARUM072BTE5:
Table of Contents

Advertisement

Job site conditions may require routing utilities—including the refrigerant
piping, condensate pipe, and electrical wiring—under the unit base. If
job site conditions warrant, consider adding mounting rails under the
unit. The unit may need to be elevated above the floor to provide the
necessary slope for proper condensate draining on long pipe
installations.
Anchoring the Outdoor Unit
• Outdoor unit support(s) must be at least ≥4 inches wide and ≥8
inches high.
• Include anti-vibration material chosen by the acoustics engineer.
• If not otherwise directed by the structural engineer or local codes,
use 7/8 inch or 1/2 inch diameter J-bolts inserted at least 3 inches
deep into the supports.
• Use a hexagon nut with a lock washer.
Table 17: Outdoor Unit Anchor Bolt Location Specifications.
Capacity (ton)
6
8
10
12
14
16
18
20
Side View of Anchor Bolts Used on the
Outdoor Unit.
See Close Up View of Anchor Bolts at right.
A (inches)
B (inches)
36-5/8
28-3/4
47-1/4
40-15/16
Close Up View of Anchor Bolts.
Spring Washer
Unit Mounting
Foot
H-Beam
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
MOUNTING / ANCHORING THE
OUTDOOR UNIT(S)
Example of an Elevated Outdoor Unit.
H-Beam Support.
Concrete Support.
Location of the Anchor Bolts on the Outdoor Unit.
Nut
Concrete
Anti-vibration
Material
Add anti-vibration material between the
outdoor unit and the support.
Leave space if the job site requires piping
and wiring to be routed from the bottom.
Anti-vibration
Material
Three Threads
Base
Unit: Inch
Four Bolts
Required
Unit: Inch
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents