Electrical - Wiring - Trane TWE031E13FB1 Installer's Manual

Convertible variable speed – air handlers 2 1/2 - 5 ton
Table of Contents

Advertisement

It is always recommended that an auxiliary drain pan
be installed under a horizontally installed air handler.
Connect the auxiliary drain line to a separate drain line
(no trap is needed in this line) and terminate according
to local codes.
NOTE:
DO NOT use a torch or flame near the plastic drain pan
coupling.
NOTE:
DO NOT tighten the drain pipe excessively. Support the
condensate piping and traps outside the unit to prevent
strain on the drain coupling.
G. ELECTRICAL — POWER WIRING
1. These Air Handlers are shipped from the factory
wired for 230 volts. The units may be wired for 208
volts. Follow instructions on unit wiring diagram lo-
ICM FAN CONTROL
CFM
SELECTION
LIGHT
0
COOLING
HEATING
AIRFLOW
DIP SWITCHES (AS SHIPPED)
cated on blower housing and in the Service Facts
document included with the unit.
2. The selection of wire and fuse sizes should be made
according to the Minimum Branch Circuit Ampacity
and the Maximum Overcurrent Device listed on the
unit nameplate.
18-GE01D1-9
DIP
SWITCHES
Figure 9
From Dwg. 800796a
FAN OFF
AUXILIARY
DELAY
HEAT SPEEDS
Installer's Guide
3. Field wiring diagrams for electric heaters and unit
accessories are shipped with the accessory.
4. Wiring must conform to National and Local codes.
Ground unit per Local codes with good safety proce-
dures.
If an electric heater is not installed, connections are
made through the 7/8" knockout into the air handler
junction box to the two power leads and ground wire
connections which are located near the discharge of the
blower
NOTE:
If air handler is used with or without a heater, the 7/8"
electrical entry hole as well as any other cabinet penetrations
must be sealed air tight.
COOLING OFF - DELAY OPTIONS
SWITCH SETTINGS
5 - OFF
6 - OFF
5 - ON
6 - OFF
5 - OFF
6 - ON
5 - ON
6 - ON
* - This setting is equivalent to the BAY24X045 relay benefit
** - This ENHANCED MODE selection provides a ramping up
and ramping down of the blower speed to provide improved
comfort, quietness, and potential energy savings. The graph
shows the ramping process.
80%
Dehumidify
50%
Fast Coil Cooling
and Heating
OFF
1
7.5
minute
minutes
COMPRESSOR OPERATION ON
NOTE:
Direct drive motors have bearings which are permanently
lubricated and under normal use lubrication is not recom-
mended.
NOMINAL
SELECTION
AIRFLOW
NONE
SAME
1.5 MINUTES
100% *
3 MINUTES
50%
ENHANCED**
50 - 100%
100% if necessary
50%
Efficiency
as required
3
minutes
OFF
OFF
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Twe037e13fbTwe040e13fbTwe049e13fbTwe065e13fb

Table of Contents