Evaporator Piping Components
Piping components include all devices and controls used to provide proper water system operation and unit
operating safety. A typical RTAF evaporator piping is shown below.
Sound power levels
Figure 9 – Typical RTAF evaporator water piping
Discharge
5
4
Measurement conditions:
Measurements taken in a room adjacent to the room containing the FWD, at the outlet of the rectangular duct (1.5 m
long) fixed to its discharge opening.
Fan
Unit
speed
7
1
FWD 08
2
3
1
FWD 10
2
3
1
FWD 12
2
3
1
FWD 14
2
3
1
FWD 20
2
3
Intake
Measurement conditions:
Measurements taken at the horizontal air intake.
1 = Isolation valve
2 = Vibration isolators
Fan
3 = Evaporator – End view (2-pass)
Unit
speed
4 = Evaporator Waterbox
1
FWD 08
2
5 = Vent
3
6 = Strainer
1
7 = Drain
FWD 10
2
3
1
FWD 12
2
3
Entering Chilled Water Piping
1
FWD 14
2
• Air vents to bleed the air from the system (to be placed
3
1
on the highest point)
FWD 20
2
• Water pressure gauges with shutoff valves
3
• Vibration eliminators
• Shutoff (isolation) valves
• Thermometers if desired (temperature readings
available on chiller controller display)
• Clean-out tees
• Pipe strainer
RLC-SVX19E-GB
UNT-PRC002-GB
3
Power level in dB(A), per Hz frequency band
6
125
250
500
B
55
50
42
57
54
47
58
57
50
57
51
45
58
54
48
60
58
50
1
57
51
45
58
54
48
60
58
50
56
62
50
61
66
55
63
69
58
57
63
51
61
66
1
55
7
C
63
69
58
Power level in dB(A), per Hz frequency band
125
250
500
56
55
55
63
62
60
66
65
63
62
58
55
66
63
60
70
67
63
62
58
55
66
63
60
70
67
63
66
65
65
73
72
69
78
76
73
68
72
64
76
76
68
78
79
71
1000
2000
2
37
37
40
30
42
32
42
34
45
38
48
40
42
34
45
38
48
40
48
39
53
47
56
50
49
40
53
47
56
50
2
Pi = Pressure gauge
FT = Water Flow Switch
T1 = Evaporator Water Inlet Temperature Sensor
1000
2000
T2 = Evaporator Water Outlet Temperature Sensor
53
46
60
53
A = Isolate unit for initial water loop cleaning
62
56
B = Vent must be installed at the high point of the line
58
51
C = Drain must be installed at the low point of the line
62
56
65
59
58
51
62
56
65
59
65
57
71
64
Leaving Chilled Water Piping
75
69
64
56
• Air vents to bleed the air from the system (to be placed
71
65
on the highest point)
74
69
• Water pressure gauges with shut off valves
• Vibration eliminators
• Shutoff (isolation) valves
• Thermometers (temperature readings available on the
chiller controller display)
• Clean-out tees
• Balancing valve
• Flow Proving Device
Evaporator Piping
Overall power
4000
8000
dB(A)
1
A
31
30
46
38
40
50
40
43
53
33
28
48
39
35
51
42
39
54
33
28
48
39
35
51
42
39
54
38
36
56
46
45
60
50
49
63
39
37
57
46
45
60
1
50
49
63
A
Overall power
4000
8000
dB(A)
45
42
57
53
53
64
55
57
67
48
44
61
55
52
66
59
57
69
48
44
61
55
52
66
59
57
69
50
46
68
59
57
74
64
63
78
52
50
69
61
61
75
66
66
78
11
53

Advertisement

Table of Contents
loading

Table of Contents