Flue Terminal Positions - Potterton iHE 100/300 Installation And Servicing Instructions

Indirect high efficiency boiler & water heater
Table of Contents

Advertisement

FLUE TERMINAL POSITIONS

The fl ue discharge position for any fl ue type must conform to the following requirements
Minimum Distance
A Directly below an opening, air brick, opening window etc.
B Above an opening, air brick, opening window etc.
C Horizontally to an opening, air brick, opening window etc.
D Below a gutter or sanitary pipework
E Below the eaves
F Below a balcony or carport roof
G From vertical drain/soil pipework
H From an internal or external corner
I Above ground, roof or balcony level
J From a surface facing terminal
K From a terminal facing the terminal
L From a opening in a carport (e.g. door, windows) into the building
M Vertically from a terminal on the same wall
N Horizontally from a terminal on the same wall
iHE
14
mm
300
300
300
75
200
200
150
300
300
600
1200
1200
1500
300
Fig 3.4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ihe 150/300

Table of Contents