Start-Up Checklist - Bryant 580J Series Installation Instructions Manual

Single package rooftop, gas heating/electric cooling vertical air flow unit with puron (r-410a) refrigerant
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION
MODEL NO.:
DATE:
II. PRE-START-UP (insert checkmark in box as each item is completed)
j VERIFY THAT JOBSITE VOLTAGE AGREES WITH VOLTAGE LISTED ON RATING PLATE
j VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
j VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j VERIFY THAT FLUE HOOD IS INSTALLED
j CHECK REFRIGERANT PIPING FOR INDICATIONS OF LEAKS; INVESTIGATE AND REPAIR IF NECESSARY
j CHECK GAS PIPING FOR LEAKS
j CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
j CHECK THAT RETURN (INDOOR) AIR FILTERS ARE CLEAN AND IN PLACE
j VERIFY THAT UNIT INSTALLATION IS LEVEL
j CHECK FAN WHEELS AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW
TIGHTNESS
j CHECK TO ENSURE THAT ELECTRICAL WIRING IS NOT IN CONTACT WITH REFRIGERANT LINES
OR SHARP METAL EDGES
j CHECK PULLEY ALIGNMENT AND BELT TENSION PER INSTALLATION INSTRUCTIONS
III. START-UP
(REFER TO UNIT SERVICE/MAINTENANCE MANUAL FOR START- -UP INSTRUCTIONS)
ELECTRICAL
SUPPLY VOLTAGE
CIRCUIT 1 COMPRESSOR AMPS
CIRCUIT 2 COMPRESSOR AMPS
INDOOR-FAN AMPS
OUTDOOR-FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
GAS HEAT SUPPLY AIR
PRESSURES (Heating Mode)
GAS INLET PRESSURE
GAS MANIFOLD PRESSURE

START-UP CHECKLIST

(Remove and Store in Job File)
SERIAL NO.:
TECHNICIAN:
L1-L2
L2-L3
L1
L2
L1
L2
L1
L2
NO. 1
NO. 2
NO. 4
NO. 5
DB
DB
DB
DB
IN. WG
IN. WG (LOW FIRE)
51
L3-L1
L3
L3
L3
NO. 3
NO. 6
WB
WB
WB
WB
IN. WG (HI FIRE)