Floor Protection; Firebrick Assembly; Draft Control; Flue Baffl E & Secondary Air Tube Installation - Regency I2400M Owners & Installation Manual

Regency wood fireplace insert owners & installation manual
Hide thumbs Also See for I2400M:
Table of Contents

Advertisement

INSTALLATION

FLOOR PROTECTION

Please check to ensure that your fl oor protection
and hearth will meet the standards for clearance
to combustibles. Your hearth extension must be
made from a non-combustible material.

FIREBRICK ASSEMBLY

Firebrick is included to extend the life of your
insert and radiate heat more evenly. Check to
see that all fi rebricks are in their correct posi-
tions and have not become misaligned during
shipping.
FLUE BAFFLE &
SECONDARY AIR TUBE
INSTALLATION
The fl ue baffl e system located in the upper area
of the fi rebox is removable to make cleaning your
chimney system easier. The baffl es must be
installed prior to your fi rst fi re. Smoke spill-
age and draft problems may occur if the
baffl es are improperly positioned. Check
the position of the baffl es on a regular basis as
they can be dislodged if too much fuel is forced
into the fi rebox.
The unit arrives with the 2 baffl e plates on the
fl oor of the fi rebox.
1) If all 4 air tubes are installed continue on
to Step 2), if not, follow the instructions
below. Install the air tube into the holes in
the side channels. The notch goes on the
right hand side with the air holes facing
toward the door. Slide the tube into the left
hand side, as far as possible and then bring
it back into the hole on the right hand side.
Use a pair of vise grips or pliers and tap it
into place with a hammer. A tighter fi t will
12
ensure the tube will not move when the unit
is burning. Though there are four air tubes
in the medium units.
2) Slide the left baffl e over the air tubes from
the front and then push it to the back.
Side View
3) Tilt the left baffl e up on top of the side chan-
nel and it will leave enough room to position
the right baffl e in the same manner as Step
1) above. Then reposition the left baffl e fl at
on the air tubes.
Front View
4) Important: push both baffl es so they are
tight against the side walls.
Front View

DOOR HANDLE

Attach spring handle by rotating counter clock-
wise onto rod. Ensure that the rod fi ts into the
entire length of the spring handle.

DRAFT CONTROL

Before establishing your fi rst fi re, it is important
that your fully understand the operation of you
draft control. The draft rod is on the left side of
the Inserts and it controls the intensity of the fi re
by increasing or decreasing the amount of air
allowed into the fi rebox. To increase your draft
- pull open, and to decrease - push closed.
Pull Open
Push Closed
As well as a primary and glass wash air system,
the unit has a full secondary draft system that
allows air to the induction ports at the top of the
fi rebox, just below the fl ue baffl e.
WARNING: To build a fi re in ignorance or to
disregard the informa tion contained in this
section can cause serious permanent dam-
age to the unit and void your warranty.

SCREEN DOOR

Hook screen to the inside on the right side
of the fi rebox door opening. Lock in place by
turning handle.
Hooks
Handle Lock
Back Side of Screen Shown
NOTE: The handle must be positioned at 10
o'clock when closed to avoid the handle from
getting hot and to ensure the screen stays in
place.
Handle at 10 o'clock position.
Regency I2400M

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents