Install The Switch On A Flat Surface; Optional Step 5: Install Sfp Transceiver Modules - NETGEAR GS728TPv2 Hardware Installation Manual

24-port and 48-port gigabit poe+ smart managed pro switches with 4 sfp ports
Hide thumbs Also See for GS728TPv2:
Table of Contents

Advertisement

24-Port and 48-Port Gigabit PoE+ Smart Managed Pro Switches with 4 SFP Ports

Install the Switch on a Flat Surface

The switch ships with four self-adhesive rubber footpads.
To install the switch on a flat surface:
Stick one rubber footpad on each of the four concave spaces on the bottom of the switch.
The rubber footpads cushion the switch against shock and vibrations. They also provide ventilation
space between stacked switches.

Optional Step 5: Install SFP Transceiver Modules

The following optional procedure describes how to install an optional SFP transceiver module into one of
the SFP ports of the switch.
Note
Contact your NETGEAR sales office to purchase these modules. If you do not want
to install an SFP module, skip this procedure.
To install an SFP transceiver module:
1.
Insert the transceiver into the SFP port.
For model GS728TPv2 or model GS728TPPv2, use port 25, 26, 27, or 28.
For model GS752TPv2 or model GS752TPP, use port 49, 50, 51, or 52.
2.
Press firmly on the flange of the module to seat it securely into the connector.
Installation
24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs752tpv2Gs728tppv2Gs752tpp

Table of Contents