Operating Instructions - Stihl BT 120 C Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

1
:
Pull off the spark plug boot (1).
:
Unscrew and dry off the spark plug.
:
Open the throttle wide.
:
Pull the starter rope several times
to clear the combustion chamber.
:
Fit the spark plug and connect the
spark plug boot – press it down
firmly.
:
Move the slide control to START.
:
Move the choke knob to e even if
the engine is cold.
:
Now start the engine.
BT 120 C
Throttle cable adjustment
:
Check adjustment of throttle cable –
see chapter on "Adjusting the
Throttle Cable".
If tank has been run completely dry
and then refilled:
:
Press the fuel pump bulb at least
fives times.
:
Now start the engine.
English / USA

Operating Instructions

During Break-in Period
A factory new machine should not be run
at high revs (full throttle off load) for the
first three tank fillings. This avoids
unnecessary high loads during the
break-in period. As all moving parts
have to bed in during the break-in
period, the frictional resistances in the
engine are greater during this period.
The engine develops its maximum
power after about 5 to 15 tank fillings.
During Operation
After a long period of full-throttle
operation, allow engine to run for a while
at idle speed so that the heat in the
engine can be dissipated by the flow of
cooling air. This protects engine-
mounted components (ignition,
carburetor) from thermal overload.
After Finishing Work
Wait for the engine to cool down. Drain
the fuel Kraftstofftank and store the
machine in a dry place. Check the
tightness of all accessible screws and
nuts (not adjusting screws) at regular
regulars and retighten as necessary.
17

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents