Download Print this page

Daikin BRC7E61W Operation Manuals page 21

Remote controller (wireless type) for fxfq-p
Hide thumbs Also See for BRC7E61W:

Advertisement

OH08-1
Installation of the Transmission
1. Remove the lid of the terminal box as described in the Installation Manual supplied with the indoor unit.
2. Fix the transmission at the bottom of the bell mouths on the indoor unit body using provided
transmission fixing screws as shown below.
3. Connect the wire harness (shorter one) from the transmission to X 24A connector on the printed circuit
board in the indoor unit. Bring out the wire harness (longer one) from the transmission to outside of the
unit through the field wiring pathway (low voltage side) of the indoor unit.
4. Fix two wire harnesses from the transmission using provided clamps.
Transmission
Installation of the Decoration Panel
Install the decoration panel as described in the Installation Manual supplied with the decoration panel.
NOTE
Watch that the wire harness (longer one) from the transmission is not caught between the indoor unit
and the decoration panel, and ceiling and the decoration panel.
Control Systems
Terminal box lid
1. Remove the lid of the
terminal box by sliding
in the direction of the
arrow (two screws).
Bell mouth
Transmission
Hitch to a tab
Wire harness
(shorter one)
4. Fix to the wires of the
indoor unit using
provided clamps.
Remote Controller (Wireless Type)
2. Fix the transmission (two screws).
(Be aware of the direction of
bringing out the wire harness.)
X 24A connector
(color: black)
2
3. Field wiring pathway
(low voltage side)
Wire harness
(longer one)
Outside
the unit
67

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Brc7e65Brc7f635fBrc7f634f