Subsequent Start-Up Procedure; Shutdown Procedure - Sullair LS-12 Operators Manual And Parts Lists

Industrial air compressor. 40, 50, 60, 75 & 100hp (30, 37, 45, 55 & 75kw) standard & 24 kt
Hide thumbs Also See for LS-12:
Table of Contents

Advertisement

7. Observe the operating temperature. If the oper-
ating temperature exceeds 200_F (93_C), the
cooling system or installation environment
should be checked.
8. Observe return line sight glasses and mainte-
nance indicators.
9. Open shut---off valve to service line.
10. Reinspect the compressor for temperature and
leaks the following day.
5.4 SUBSEQUENT START---UP PROCEDURE
On subsequent start---ups, check that the proper
level is visible in the fluid sight glass and simply
press the START button. When the compressor is
running, observe the instrument panel and mainte-
nance indicators.

5.5 SHUTDOWN PROCEDURE

To shut the compressor down, simply press the
STOP button.
Section 5
OPERATION
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ls-16

Table of Contents