Genie RL4 Vertical Mast Service Manual page 19

Table of Contents

Advertisement

August 2015
Maintenance Symbols Legend
Note: The following symbols have been used in this
manual to help communicate the intent of the
instructions. When one or more of the symbols
appear at the beginning of a maintenance
procedure, it conveys the meaning below.
Indicates that tools will be required to
perform this procedure.
Indicates that new parts will be required to
perform this procedure.
Indicates that dealer service will be
required to perform this procedure.
Indicates that a cold engine will be
required to perform this procedure.
Indicates that a warm engine will be
required to perform this procedure.
Part No. 1266665
Scheduled Maintenance Procedures
Pre-delivery Preparation Report
The pre-delivery preparation report contains
checklists for each type of scheduled inspection.
Make copies for each inspection. Store completed
forms as required.
Maintenance Schedule
The Scheduled Maintenance Procedures section
and the Maintenance Inspection Report have been
divided into subsections. Use the following chart to
determine which group(s) of procedures are
required to perform a scheduled inspection.
Inspection
Daily or every 8 hours
Quarterly or every 250 hours
Semi-annually or every 500 hours
Annually or every 1000 hours
Two-year or every 2000 hours
Maintenance Inspection Report
The maintenance inspection report contains
checklists for each type of scheduled inspection.
Make copies of the Maintenance Inspection Report
to use for each inspection. Maintain completed
forms for a minimum of 4 years or in compliance
with your employer, jobsite and governmental
regulations and requirements.
RL4 Vertical Mast
Service Manual
Checklist
A
A + B
A + B + C
A + B + C + D
A + B + C + D + E
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents