Installation; Preparing The Installation Site; Installing The Display - Raymarine Viewable Marine Displays User Manual

Sunlight viewable marine displays
Table of Contents

Advertisement

16

Installation

Preparing the installation site

3
To ensure correct dimensions,
use the template provided.
1. Select an installation site that has sufficient space behind for
cable connections and ventilation.
2. Tape the supplied template in the required position.
3. Using a jigsaw, carefully remove the shaded portion of the
template.
4. Using a suitable file, smooth the edges of the aperture.
2
1 5 "
L C
D P
a n
e l
te m
p la
te
Dr ill
4. 1
m ou
m m
nt in
(4 po
g ho
di am
si tio
le
ns )
et er
R e m
s h a
o v e
d e d
a r e
o n l
a s
y
ce n
te r
lin e
39 1.
6 m
m (1
5. 4
in )
In st
ru m
en t
ed ge
Su n
co ve
r ed
ge
Raymarine Sunlight Viewable Marine Displays - Users Guide

Installing the display

1. Carefully insert the monitor into the aperture, ensuring that
the gasket on the rear of the fascia lays flat against the aper-
ture edge.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G170G190

Table of Contents