Utility Interruption Of; Charging - Chevrolet BOLT EV 2018 Owner's Manual

Table of Contents

Advertisement

250
Driving and Operating
5. Securely mount the charge
cord on to the screws.
6. Connect the wall plug to the
electrical outlet.
7. Connect the vehicle plug to the
charge port.
Lock Feature
A lock can be added to the vehicle
plug for additional security.
FCC Information
See Radio Frequency Statement
0 342.

Utility Interruption of

Charging

This vehicle will respond to requests
through the utility company to limit
or completely block electrical power
grid usage. This feature is inactive
during DC charging. A utility
interruption of charging will lengthen
the vehicle charge time.
When electrical grid power is
completely blocked, the vehicle will
delay charging until the utility
interruption has expired. The vehicle
should be left plugged in so that the
vehicle can automatically begin
charging.
Changing the charge mode to
Immediate or performing a delayed
charging override will not disable a
utility interruption.
A pop-up will appear in the
infotainment display while starting
the vehicle following any utility
interruption. See Charging
Interrupted or Overridden Pop-Up
under Programmable Charging
0 131.
A message will display on the
instrument cluster indicating that a
utility interruption has occurred.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents