Siemens RUGGEDCOM WIN5237 Installation Manual page 24

Table of Contents

Advertisement

Chapter 2
Installing the Subscriber Station
• The RJ45 connector kit (included). Contains an RJ45 connector and loading bar.
• CAT-5e cable of suitable length for your application. For information on cable specifications, refer to
Section 3.5, "IDU to ODU Cable
• Standard cable splicing tools, including a standard crimp tool.
To assemble the PoE connector, do the following:
1.
Slide the connector components on to the wire.
Figure 8: Assembling the Connector Components
1. Plug Housing    2. Dust Cover
2.
Strip the wire jacket 38 mm (1.5 in) from the tip, making sure not to cut the foil or drain wire.
Figure 9: Cutting the Jacket
1. Wire Jacket    2. Foil
3.
Fold the foil back over the wire jacket.
18
Specifications".
1
1
2
2
38 mm
(1.5 in)
RUGGEDCOM WIN5237
Installation Guide
Assembling the PoE Connector

Advertisement

Table of Contents
loading

Table of Contents