Preparations for Installation
1-1-6
Setting the Line Connection Cable and the Relay Board
A) Line connection cable
The line signal cables are required for the machine of line specifications.
Connect the line cable. (Refer to the page 1-7.)
B) Setting the relay board
1) Single
2) Line connection
3)
Connection with other
maker's machine
Specifications of line signal
Such signals as the delivery of board between the front and rear processes production end, or air
pressure are connected among each machine with a cable.
Page 1-6
:
:
:
Machine 1
CN01
CN00
Control
box
CN00 1-2 short (Line air pressure)
CN00 1-2 open (Line air pressure)
Connection board "EC55CX" J7 2-3 short (Ready signal)
CN00 1-2 short (Line air pressure)
Connection board "EC55CX" J7 1-2 short (Ready signal)
Machine 2
CN01
Control
box
Machine 3
CN00
Control
box
1F4C-E-IMA01-A01-00