Pressing
will result in the original value being restored and the filter rating menu
being quit.

7.9.2.5 Setting up the user's requirements

For
entering the
[/Welcome/Settings/Commissioning/User]
At the commissioning level, a shortcut exists to the principal user set up menus. These
consist of:
-
Setting up the filter mode for the main settings. After selecting the desired value,
press
to go to the next step.
-
Setting up the harmonic selection table for the main settings. After entering the
desired values (cf.
displayed.
-
Setting up the reactive power requirements including balancing for the main
settings. After selecting the desired values, press
-
After entering the data, the main settings can be copied on to the auxiliary
settings (if desired) by pressing
-
The set-up ends by displaying the main commissioning menu.
Remarks:
-
Refer to
Section 7.9.1.1
settings, the filter mode, the harmonics selection table and reactive power setup
possibilities.
user's
requirements at
Section
7.9.1.1), press
for more explanation on the main and auxiliary filter
Manual Power Quality Filter PQFM ç The PQF-Manager user interface 133
the commissioning level,
repeatedly until the next step is
to go to the next step.