PLACEMENT

The leveling legs on this unit come pre-installed, however some
adjustments may be required .
Move the assembled unit to its final location.
-
-
Using a carpenter's level, turn the base of each leg until the
cabinet is level .
-
Final hook up of the supply lines and drain system can now be
completed .
NOTE:
The caster (G) is pre-installed.
SUPPLY LINES (NOT INCLUDED)
The supply lines that attach the faucet to the household
water system, are not supplied with this unit . They need to be
purchased separately .
Follow the manufacturers instructions for proper installation of
the supply lines .

INSTALLING THE DRAWER HANDLES

WARNING:
Do not overtighten screws as you may damage
the unit .
1 . Remove the pre-installed drawer handles, screws and
washers from inside the drawer .
2 . Insert each screw through a washer, then insert screw into
the four pre-drilled holes .
3 . Thread each screw into the handles . Do not overtighten
screws (see Fig . 4) .