G
Initial start-up checklist
Name
Street/house number
Postcode
Town/city
Telephone
Start-up date
Serial number
Hydraulic scheme
G.1
Initial start-up checklist
System, general
Building type (single/multiple-occupancy house, special
building)
Used for commercial purposes?
Year of manufacture
Insulation status/renovation
System output
Previous gas/energy consumption
Heated surface
Number of heating circuits
Underfloor heating circuits
Radiator heating circuits
Ventilator heating circuits
Water hardness when starting up
System volume
Added additive: Designation, amount
Gas supply
Type of gas
Heating value
Gas pressure regulator available?
If yes, which type?
Condensate discharge
Condensate trap filled?
Condensate drain pipework routed with a downward
gradient?
Neutralisation system available (> 200 kW)?
If yes, which manufacturer?
Condensate pump available (if required)?
Condensate pump control line connected?
Hydraulics
Heating circuit system pressure
Piping at least 1.5 inches (single unit)
Piping at least DN65 (cascade up to 360 kW)
Piping at least DN100 (cascade > 360 kW)
Expansion relief valve
System separation using a plate heat exchanger
If yes, which type?
0020134823_04 ecoTEC plus Installation and maintenance instructions
Location
Competent person
Yes
No
Values
Appendix
Customer Service tech-
nician
Unit
kW
m³ or kWh/a
mol/m³ or mg/l
CaCO₃
l
kWh/m³
MPa (bar)
MPa (bar)